Part of the River Pines neighborhood was paved in the summer of 2013. The roads in the neighborhood had several problems ranging from puddling, overgrown vegetation into the roadway, and consistent erosion along the gravel roadways. The gravel roadways in the neighborhood required continual regrading and maintenance, especially after storms.
The work included leveling and overlay the roadways to direct stormwater runoff to the new water quality swales constructed along the roadway. The gravel roads were regraded and paved to promote improved drainage and to alleviate the required continual maintenance of a gravel surface.
New stormwater water quality swales were designed and installed in the area to comply with Stormwater Management Policies, providing storage and treatment to stormwater runoff and eliminating sedimentation of the gravel roads into the Concord River.
The following roads were paved in this neighborhood:
Alderwood Ave,
Biagiotti Way,
Ciccone Way,
Cypress Way,
Eastwood Ave,
Ledgelawn Ave,
Old Middlesex Tpke,
Pinewood Ave,
Ridgewood Ave,
River St Ext,
Rosewood Ave Ext,
Trifiro Rd.