The scope of work for the project consists of approximately 29,000 linear feet (If) of new gravity sewer and 8,000 linear feet of water main and 14,500 linear feet of sidewalk in East Billerica. Construction of the sewer includes all site work, appurtenant utilities and services within the Town Right of Way.
The Work includes labor, material and equipment, services required for construction, testing, and commissioning of the Project in accordance with the Contract Documents and as more specifically described in the Specifications and Drawings and includes, but is not limited to, the following principal features:
I . Construction of gravity sewer
2. Replacement of water mains and appurtenances
3. Temporary water and sewer bypass systems
4. Roadway and off road restoration
The Town will begin construction beginning in November 2015 with a scheduled completion date of November 2017. DeFelice Corporation of Dracut, MA has been issued a Notice to Proceed.