Middlesex Turnpike Reconstruction Project (Phase 3) - MassDOT TIP Project

Since the 1980’s the Town’s of Bedford, Burlington and Billerica have collaborated to reconstruct the Middlesex Turnpike to improve capacity of this regional roadway in an effort to attract business to the area, stimulate economic growth in an existing business area, and improve access to Routes 3 and 128. 

Work completed to date within Burlington and Bedford is shown as follows:
The remaining work under Phases 2 and 3 of this project consists of transportation and drainage improvements along the Middlesex Turnpike. These phases include expansion of the existing two-lane roadway to a four-lane roadway with turning lanes on a 2.6 mile section of the Middlesex Turnpike between Route 62 and the intersection with Manning Road; the MITRE Link, between Middlesex Turnpike and Network Drive; a 6-foot wide sidewalk along the length of the turnpike; drainage system improvements; culvert replacement at the Shawsheen River; the relocation of Plank Street; wetland replication and flood compensation areas. The project limits are as follows:
Phase 2's construction is essentially complete.  Phase 3 is 75% designed with an approximate construction cost of $16,000,000. This project is planned to be funded through the 2016 Transportation Improvement Program for the Boston Metropolitan Planning Organization. Extensive Right of Way and environmental permitting efforts remain to be completed on the project.